one Pipe screw conveyor The base of the device shall be achieved at least 20 days before the formal installation screw. It is basically reliable and can support the conveyor and ensure that the sinking and additional changes of the storage type screw conveyor are not caused by the basic too small, and ensure the sufficient stability of the tubular screw conveyor during operation.  
2. Local dirt stuck in the process of transportation or unloading before the device on the tubular screw conveyor.
3. The flange surface of adjacent shell shall be flat and tight, and the error of nominal joint in shell shall not exceed 2 mm.
 Installation skills of tubular screw conveyor  
4. Asbestos tape is allowed to be used between the flange of shell to adjust the accumulated error between shell and spiral length.  
The clearance between the casing and the casing of the screw conveyor should be in accordance with table 5. The gap should not be less than 50% of the nominal gap. If a larger gap is required, it should be based on the user's request.  
The hanger on the screw conveyor should be firmly fixed next to the lifting lug of the screw conveyor. After the screw is connected, the screw rotates averagely without paper jam. When installing, adjust the washer between the suspension bearing seat and the housing lug to ensure that the lifting shaft is coaxial.  
 Quotation of tubular screw conveyor
7. The coaxiality between the main shaft of tubular screw conveyor and the shaft of gear motor shall meet the requirements.  
8. After accurately installing the chassis, tighten the base of the screw machine.  
9. All coupling screws shall be tightened to a firm level.  
 Video of pipe screw conveyor
10. The field device of inlet and outlet shall make the flange bearing of inlet and outlet parallel to the axis of screw body, and the flange to be connected shall be closely matched.  
11. After installing the tubular screw conveyor, check whether there is enough smooth oil in each oil storage position. If not, it will be increased. After that, there is no load test. After the no-load test running for more than 4 hours, the accuracy of screw machine components should be checked. If the phenomenon is not accurate, please end it in time, and then operate after proofreading until it is in good running condition.
 Pipe screw conveyor equipment


Xinxiang Guosheng Machinery Equipment Co., Ltd Yu ICP Bei 14028944-2 Xindi, the exit of Jixi Expressway

Online consultation
Ask for a quotation
Sales Hotline

Sales Hotline: 13569819530